 | 
 |
|
Copyright©Everestnews.com |
As per the
message received from the Basecamp (Liaison Officer) the following six members
and six High Altitude Workers of "BSF Everest Expedition 2006" team climbed
Mt. Everest at 6.00 a.m. on 20th May 2006.
1. Mr.
Loveraj Singh Dharmshaktu (33), Government Employee, Bouna, Pithoragarh,
Uttaranchal, India,
2. Mr.
Kamlesh Kumar Bounthiyal (36), Government Employee, Gounchakhet, Malethi,
Pauri Garhwal, Uttaranchal, India,
3. Mr.
Praveen Singh Lohis (31), Government Employee, CGO Complex, Lodhi Road, New
Delhi, India
4. Mr.
Kedar Singh (30), Government Employee, CGO Complex, Lodhi Road, New Delhi,
India,
5. Mr.
Bhagat Singh Rawat (28), Government Employee, CGO Complex, Lodhi Road, New
Delhi, India,
6. Mr.
Manoj Dahal (28), Government Employee, CGO Complex, Lodhi Road, New Delhi,
India,
- Mr. Rita
Dorjee Sherpa (29), High Altitude Worker, Khumjung - 9, Solukhumbu, Nepal,
- Mr.
Ningma Tshiring Sherpa (40), High Altitude Worker, Khumjung - 9, Solukhumbu,
Nepal.
- Mr.
Thukten Dorjee Sherpa (38), High Altitude Worker, Namche - 7, Thame,
Solukhumbu, Nepal,
- Mr.
Pemba Tshiring Sherpa (26), High Altitude Worker, Khumjung- 2, Solukhumbu,
Nepal.
- Mr.
Tshiring Phinjo Sherpa (33), High Altitude Worker, Khumjung - 1, Solukhumbu,
Nepal.
- Mr.
Neema Kancha Sherpa, Khumjung-1, Solukhumbu, Nepal.
The above
mentioned expedition team comprising of 10 members was permitted to climb 8848
meter high Mt. Everest from normal route for the period of 75 days from 3rd
April, 2006 under the leadership of Mr. Sharab Chandub Negi from India.
The handling
agency of the expedition team is Asian Trekking Pvt. Ltd., Kathmandu, Nepal.
20th May, 2006
As per the
message received from the Basecamp (Liaison Officer) the following seven
members and six High Altitude Workers of "Alpine Ascents International Mt.
Everest Expedition 2006" team climbed Mt. Everest at 7.00 a.m. and 8.50 a.m.
on 20th May 2006.
7.00 a.m., 20th May 2006
1. Mr. David
Charles Morton (35), Mountain Guide, Seattle WA, USA,
2. Mr.
Chris Nichols (47), Attorney, Ramcreek Trail reno, Navada, USA,
3. Mr.
Alistair Sutcliffe (40), Family Doctor, Sleights, North Yorkshire, UK,
- Mr. Kami
Rita Sherpa (37), High Altitude Worker, Namche - 7, Thame, Solukhumbu,
Nepal
- Mr.
Chewang Nima Sherpa (39), High Altitude Worker, Namche - 4, Solukhumbu,
Nepal.
8.50 a.m., 20th May 2006
6. Mr.
Vernon E. Tejas (53), Mountain Guide, Mercer Street, Seattle, USA,
7. Ms.
Suzanne Nance (46), Inverway, IL, USA,
8. Dr.
Jacques Pirenne (44), Doctor, Jachthoorn, Linden, Belgium,
9. Mr.
Gerhard Alfons Winkler (50), Retired, Kreindlgasse, Vienna, Austria,
- Mr.
Lakpa Rita Sherpa (40), High Altitude Worker, Namche - 7, Thame,
Solukhumbu, Nepal,
-
Mr.Tshiring Dorjee Sherpa (35), High Altitude Worker, Juving - 1,
Solukhumbu, Nepal.
- Mr.
Ningma Tshiring Sherpa (35), High Altitude Worker, Namche -7, Thame,
Solukhumbu, Nepal,
- Mr. Fur
Kancha Sherpa (45), High Altitude Worker, Namche- 7, Thame, Solukhumbu,
Nepal.
The above
mentioned expedition team comprising of 8 members was permitted to climb 8848
meter high Mt. Everest from normal route for the period of 75 days from 29th
March, 2006 under the leadership of Mr. David C. Morton of USA.
The handling
agency of the expedition team is Sherpa Shangri-La Treks and Expedition Pvt.
Ltd., Kapan, Kathmandu, Nepal.
20th May, 2006
As per the
message received from the Basecamp (Liaison Officer) the following one High
Altitude Worker of "2006 IMG Everest Expedition (II)" team climbed Mt. Everest
at 3.00 a.m. on 20th May 2006.
1. Mr. Da Nuru Sherpa (49),
High Altitude Worker, Khumjung - 9, Phortse, Solukhumbu, Nepal,
The above
mentioned expedition team comprising of 8 members was permitted to climb 8848
meter high Mt. Everest from normal route for the period of 75 days from 23rd
March, 2006 under the leadership of Mr. David Allen Hahn of USA.
The handling
agency of the expedition team is Great Escapes Trekking Pvt. Ltd., Kathmandu,
Nepal.
20th May, 2006
As per the
message received from the Basecamp (Liaison Officer) the following one member
and one High Altitude Worker of "2006 IMG Everest Expedition (I)" team climbed
Mt. Everest at 3.00 a.m. on 20th May 2006.
1. Ms. Brenda
Lucky Walsh (33), Mountain Guide, Seattle, WA, USA,
- Mr.
Mingma Tenzing Shrepa (20), High Altitude Worker, Khumjung - 9, Solukhumbu,
Nepal.
The above
mentioned expedition team comprising of 8 members was permitted to climb 8848
meter high Mt. Everest from normal route for the period of 75 days from 23rd
March, 2006 under the leadership of Mr. Justin Reese Merle of USA.
The handling
agency of the expedition team is Great Escapes Trekking Pvt. Ltd., Kathmandu,
Nepal.
 |
Millet One
Sport Everest Boot has made some minor changes by adding
more Kevlar. USES Expeditions / High
altitude / Mountaineering in extremely cold conditions / Isothermal to
-75°F Gore-Tex® Top dry / Evazote Reinforcements with aramid threads.
Avg. Weight: 5 lbs 13 oz Sizes: 5 - 14 DESCRIPTION Boot with semi-rigid
shell and built-in Gore-Tex® gaiter reinforced by aramid threads, and
removable inner slipper Automatic crampon attachment Non-compressive
fastening Double zip, so easier to put on Microcellular midsole to
increase insulation Removable inner slipper in aluminized alveolate
Fiberglass and carbon footbed Cordura + Evazote upper Elasticated
collar.
Expedition footwear for
mountaineering in conditions of extreme cold. NOTE US
SIZES LISTED. See more here. |
|
|
 |
A cold
weather, high altitude double boot for extreme conditions The Olympus
Mons is the perfect choice for 8000-meter peaks. This super lightweight
double boot has a PE thermal insulating inner boot that is coupled with
a thermo-reflective outer boot with an integrated gaiter. We used a
super insulating lightweight PE outsole to keep the weight down and the
TPU midsole is excellent for crampon compatibility and stability on
steep terrain. WEIGHT: 39.86 oz • 1130 g LAST: Olympus Mons
CONSTRUCTION: Inner: Slip lasted Outer: Board Lasted OUTER BOOT: Cordura®
upper lined with dual-density PE micro-cellular thermal insulating
closed cell foam and thermo-reflective aluminium facing/ Insulated
removable footbed/ Vibram® rubber rand
See more here. |
|
|
|  |