
|
 |
|
Above the Second Step headed for the
Summit ©EverestNews.com |
|
Update: 2006
Turkish Everest Expedition, made all in all on the top of Everest. On the
24th May 2006 early morning 5.00am, 06 Turkish expedition members & 03
climbing Sherpa reached on the world’s highest peak Mt Everest. This is the
2nd attempts for the Turkish team.
On the
1st attempts they return from very near to the summit of Mt Everest But they
didn’t think, that is their final achievements for Turkish. They don’t want
to return by empty hands to Turkey. They want to achieve what they promised
to the Turkish peoples before going for Everest. Therefore finally they made
it successfully.
At the
moment they are taking rest at the base camp & waiting for the base camp
support members. On this occasion, we Nepal Local Operator ARUN TREKS &
EXPEDITION wants to express hearty Congratulation to all the Turkish Everest
summiteers & Climbing Sherpa who are the main body of this big achievements.
|
01. |
BORA
MAVIS
|
M |
TURKISH |
|
02. |
MUHIBE SUNA YILMAZ
|
F
|
TURKISH |
|
03. |
MUSTAFA CIHAN |
M |
TURKISH |
|
04. |
BURCAK OZOGLU POCAN |
F |
TURKISH |
|
05. |
SERHAN POCAN |
M |
TURKISH |
|
06. |
MELTEM OZMINE
|
F |
TURKISH |
Background: 2006 Turkish Everest expedition team, the first time in
the history of Turkish Mountaineering expedition that they are taking an
individual Everest expedition team. They are climbing the from North ridge
of Everest. The team is under the leadership of Mr Serhan Pocan. They will
arrive in KTM on 28th march 2006 & departed to BC on 1st
of April 2006. The following are the team members including the Base camp
members.
Name Nationality
Mr Serhan Pocan
Turkish
Mr Bora Mavis
Turkish
Ms Muhibe Suna Yilmaz
Turkish
Mr Sooner Buyukatalay
Turkish
Mr Memduh Haldun Ulkenli
Turkish
Mr Mustafa Cihan
Turkish
Ms Eylem Elif Mavis
Turkish
Ms Burcak Ozoglu Pocan
Turkish
Mr Serkan Girgin
Turkish
Ms Meltem Ozmine
Turkish
Mr Mustafa Temiztas
Turkish
Mr Hakan Kocakulak
Turkish
They reached on the north col 7900 meters on 24th
& 25th April 2006.
The Sherpa staffs already taken all the foods & oxygen cylinders to the last
camp 8300 meters. From 27th to 3rd April of may they
taken rest on the Base camp & on the 4th of May they move to the
Advance base camp. After spending the couples of nights on the ABC then they
will move to the 8300 meters in order to spent over night their. They are
planning for summit attempt between 15th may to 20th may 2006.
 |
Millet One
Sport Everest Boot for Spring 2009 has made some minor changes by adding
more Kevlar. USES Expeditions / High
altitude / Mountaineering in extremely cold conditions / Isothermal to
-75°F Gore-Tex® Top dry / Evazote Reinforcements with aramid threads.
Avg. Weight: 5 lbs 13 oz Sizes: 5 - 14 DESCRIPTION Boot with semi-rigid
shell and built-in Gore-Tex® gaiter reinforced by aramid threads, and
removable inner slipper Automatic crampon attachment Non-compressive
fastening Double zip, so easier to put on Microcellular midsole to
increase insulation Removable inner slipper in aluminized alveolate
Fiberglass and carbon footbed Cordura + Evazote upper Elasticated
collar.
Expedition footwear for
mountaineering in conditions of extreme cold. NOTE US
SIZES LISTED. See more here. |
|
|
|

|
|