
 |
|
Copyright© Billy
Pierson: Murph goes to K2: The best K2 video on the planet:
VHS or
DVD |
2. Country: Serbia (Province:
Vojvodina, Cities: Novi Sad&Subotica)
3. Name of the Leader:
Milivoj Erdeljan
4. Name of the Peak:
Gasherbrum-1 and Gasherbrum-2
5. Arrival Date: 13/06/2006.
6. No of participants: 05
No one from expedition from
Serbia was not trying to climb two peaks over 8.000 m just in one year.
Project "Serbia-KaraKorum" made of five (5) climbers which goal is two (2)
peacks over 8.000 m. They planed to climb Gasherbrum 1 (8.068) and Gasherbrum
2 (8.035). Project "Serbia-Karakorum" start at June 5th and will be ended at
August 19th 2006.
This team of climbers in past
time summit:
2003 - KIlimanjaro (5.896)
and Barunze (7.129),
2004 - Shisha Pangma (8.012)
and
2005 - Mount Everest
(8.848).
(All climbers are from
Serbian province Vojvodina, northern part of Serbia where the highest mountain
is Fruska Gora - 539 m).
ITINERARY: Gasherbrum 1
(8.068m) and Gasherbrum 2 (8.035m)
|
5.6.2006. |
Day 01 |
Fly Belgrade-Dubai |
|
6.6.2006. |
Day 02 |
Fly Dubai- Islamabad |
|
7.6.2006. |
Day 03 |
Islamabad |
|
8.6.2006. |
Day 04 |
Islamabad |
|
9.6.2006. |
Day 05 |
Islamabad; Briefing at
Ministry of Tourism. |
|
10.6.2006. |
Day 06 |
Drive to Chilas (480 km) |
|
11.6.2006. |
Day 07 |
Drive to Skardu (275 km) |
|
12.6.2006. |
Day 08 |
Rest at Skardu . |
|
13.6.2006. |
Day 09 |
Drive to Askole (3.000 m)
(96 km) |
|
14.6.2006. |
Day 10 |
Trek to Jhola (3.200 m) (8
hrs) |
|
15.6.2006. |
Day 11 |
Trek to Paiyu (3.600 m) (6
hrs) |
|
16.6.2006. |
Day 12 |
Rest at Paiyu (3.600 m) |
|
17.6.2006. |
Day 13 |
Trek to Khuburtze (4.000
m) (3 hrs) |
|
18.6.2006. |
Day 14 |
Trek to Urdukas (4.200 m)
(3 hrs) |
|
19.6.2006. |
Day 15 |
Trek to Goro II (4.500 m)
(7 hrs) |
|
20.6.2006. |
Day
16 |
Trek to Concordia (4.700
m) (6 hrs) |
|
21.6.2006. |
Day 17 |
Trek to G-I/G-II Base Camp
(5.045m) (8 hrs) |
|
22.6./10.8.2006. |
Day18/67 |
Climbing G -1
C-1 (5.900 m);
C-2 (6.500 m);
C-3 (7.300 m).
climbing G - 2
C-1 (5.900 m);
C-2 (6.400 m);
C-3 (7.200 m). |
|
11.8.2006. |
Day 68 |
Trek to Vigne Glacier
(4.800 m) (6 hrs) |
|
12.8.2006. |
Day 69 |
Trek to Gondogoro-La
(5.680m) / Khuspan (4.680m) (9 hrs) |
|
13.8.2006. |
Day 70 |
Trek to Shaieshcho (3.600
m) / Hushe (3.300 m) (9 hrs) |
|
14.8.2006. |
Day 71 |
Drive to Skardu (2.340 m) |
|
15.8.2006. |
Day 72 |
Drive to Islamabad /
Chilas |
|
16.8.2006. |
Day 73 |
Islamabad |
|
17.8.2006. |
Day 74 |
Islamabad; De-briefing at
Ministry of Tourism. |
|
18.8.2006. |
Day 75 |
Fly Out; Transfer to
airport for your return flight home. |
|
19.8.2006. |
Day 76 |
Belgrade |
 |
Millet One
Sport Everest Boot has made some minor changes by adding
more Kevlar. USES Expeditions / High
altitude / Mountaineering in extremely cold conditions / Isothermal to
-75°F Gore-Tex® Top dry / Evazote Reinforcements with aramid threads.
Avg. Weight: 5 lbs 13 oz Sizes: 5 - 14 DESCRIPTION Boot with semi-rigid
shell and built-in Gore-Tex® gaiter reinforced by aramid threads, and
removable inner slipper Automatic crampon attachment Non-compressive
fastening Double zip, so easier to put on Microcellular midsole to
increase insulation Removable inner slipper in aluminized alveolate
Fiberglass and carbon footbed Cordura + Evazote upper Elasticated
collar.
Expedition footwear for
mountaineering in conditions of extreme cold. NOTE US
SIZES LISTED. See more here. |
|
|
 |
A cold
weather, high altitude double boot for extreme conditions The Olympus
Mons is the perfect choice for 8000-meter peaks. This super lightweight
double boot has a PE thermal insulating inner boot that is coupled with
a thermo-reflective outer boot with an integrated gaiter. We used a
super insulating lightweight PE outsole to keep the weight down and the
TPU midsole is excellent for crampon compatibility and stability on
steep terrain. WEIGHT: 39.86 oz • 1130 g LAST: Olympus Mons
CONSTRUCTION: Inner: Slip lasted Outer: Board Lasted OUTER BOOT: Cordura®
upper lined with dual-density PE micro-cellular thermal insulating
closed cell foam and thermo-reflective aluminium facing/ Insulated
removable footbed/ Vibram® rubber rand
See more here. |
|
|
|